Some of the projects we have carried out
We say that we work on the most demanding railway projects. Discover it yourself
Biobío
Chile
The new railway bridge over the Biobío River is the largest infrastructure of its kind in Chile, with 1.8 km in length, a double electrified track, and a 325-meter tunnel excavated in rock. It replaces the old 1889 bridge, improving capacity, safety, and continuity of railway service in the Biobío Region.
In this project, ARCA contributed by supplying critical electrification components, including brackets, droppers, compensation devices, and section insulators, which ensure the stability, reliability, and safety of the catenary in a landmark project for Latin America.
Tren Maya
Mexico
The Tren Maya is a significant national railway project aimed at revolutionizing transportation in Mexico. As a foundational project for future expansions, it spans approximately 1,440 km, connecting key regions and promoting sustainable development. ARCA Catenary provides comprehensive supply of all overhead line components, ensuring adaptability to the evolving demands of the project.
Optimizing tram solutions
Antalya, Turkey
In the Antalya tram project, ARCA provides expert advice to ensure the selection of the most optimal technical solution.
Follo Line Tunnels
Norway
For the Follo Line project in Norway, ARCA supplies essential catenary components for tunnel infrastructure, with a focus on the compensation system. ARCA has developed a specific compensation design tailored to meet the client’s unique requirements.
SNCF
France
ARCA undertakes the development of required components from scratch for the state-owned French railway company, SNCF. Leveraging our technical and production capabilities, we homologate numerous references simultaneously, ensuring compliance and efficiency.